We took out the drywall and left the framing so that the structural engineer can get a good look at the space. This also included plenty of trips in the attic and under the crawl space. He has a plan that he will get drafted up and we can start the permitting process for this!
The most exciting part of this is the incredible view of the lake you get from the front door.
Still has the wonderful formal feature of a proper foyer, but then gets to be dramatically open concept. When your view is this nice it's amazing to get to be able to appreciate it from so many rooms.
Here it is fully opened up and waiting on permitting for the beam to be installed.
And what's that? It's the new wall creating a formal dining room. It has double pocket doors which allows for the room to maintain it's open feel while providing a formal eating space for special occasions.
At this point all of the carpet, linoleum, and laminate flooring has been removed and we are down to the wood subfloor.
















